MIL-DTL-17060G(SH)
APPENDIX E
CERTIFICATION DATA/REPORT TECHNICAL CONTENT REQUIREMENTS
E.1. SCOPE
E.1.1 Scope. This appendix covers information that shall be included in the certification/data report. When
specified in the contract or order (see 6.2), this appendix is a mandatory part of the specification. The information
contained herein is intended for compliance.
E.2. CERTIFICATION REPORT CONTENT REQUIREMENTS
E.2.1 Certification for sealed insulation systems. The contractor's facility shall be certified for implementation
of a sealed insulation system prior to furnishing motors to the Government. A copy of the NAVSEA letter
qualifying the contractor's facility for implementation of a sealed insulation system shall be forwarded to the
Government, as specified in 4.6.19.1 of this specification, as evidence of certification.
88
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business