MIL-PRF-62361E
4.4.1 Sampling. Unless otherwise specified (see 6.2), the sampling plan for the
conformance inspection shall be in accordance with ANSI/ASQC Z1.4.
TABLE III. Inspection.
First
Conformance
Description
Requirements
Verification
article
test
Rotation of output shaft
3.3.1.1
4.5.1
X
X
Speed and current
3.3.1.2
4.5.2
X
X
Type III speed
3.3.1.2.1
4.5.3
X
X
Type III starting current
3.3.1.2.2
4.5.4
X
X
Type III torque
3.3.1.2.3
4.5.5
X
X
Driving and slipping torque
3.3.1.3
4.5.6
X
X
Operating voltage
3.3.1.4
4.5.7
X
Plug reversal
3.3.1.5
4.5.8
X
X
Duty cycle
3.3.1.6
4.5.9
X
X
Insulation resistance
3.3.1.7
4.5.10
X
X
Dielectric withstanding
3.3.1.8
4.5.11
X
X
voltage
Lead strength
3.3.1.9
4.5.12
X
X
Dimensions
3.3.1.10
4.5.13
X
X
High operating temperature
3.4.1.1
4.6.1.1
X
High nonoperating
3.4.1.2
4.6.1.2
X
temperature
Low operating temperature
3.4.1.3
4.6.1.3
X
Low nonoperating
3.4.1.4
4.6.1.4
X
temperature
Operating humidity
3.4.2.1
4.6.2
X
Nonoperating humidity
3.4.2.2
4.6.2
X
Operating pressure
3.4.3.1
4.6.3.1
X
Nonoperating pressure
3.4.3.2
4.6.3.2
X
Sand and dust
3.4.4
4.6.4
X
Salt fog
3.4.5
4.6.5
X
Fungus
3.4.6
4.6.6
X
Vibration (nonoperating)
3.4.7
4.6.7
X
Shock (nonoperating)
3.4.8
4.6.8
X
Transient Voltage
3.4.9
4.6.9
X
Electromagnetic Interference
3.5
4.7
X
8
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business