MIL-DTL-17060G(SH)
TABLE XVIII. First article inspection Continued.
Inspection
Requirement
Test method
Sealed insulation system suitability 1/
Efficiency
Preload device (submarine motors
with special pre-load requirements
only)
Sealed insulation system electrical
(VSD motors only)
Partial discharge inception voltage and
rise time
Electromagnetic interference
Inspection of packaging
NOTE:
1/
These are one-time tests and need not be repeated once satisfactorily demonstrated
unless either material or processes change.
41
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business